EVO Remolded A/C controls

on 05 April 2011
Created: 05 April 2011

We’re back with the second in a series of installments highlighting the build-up of a Mitsubishi Evolution we’ve featured in issue 8.03 (July 2006.) The vehicle was built by the Installer Institute’s Director Jason Anderson and Lead Instructor Jack Randall in Daytona Beach, FL.

This install centered on moving the factory HVAC controls to make room for an in-dash monitor. When designing a custom install for certain vehicles it can be difficult to install the aftermarket equipment in factory locations. For the Evolution it involved relocating the A/C controls to a pocket below the radio and factory A/C bezel. As usual, when they’re done, you’re hard-pressed to tell the HVAC controls are not in their factory locations.

Read the full article at Pas Mag, below:

Certifications & Accreditations

Accet logo
BBB Business Review logo
SBCA Certification logo
MESA Certification logo
MECP Certification logo
Florida Association of Veterans Education Specialists logo
Federal Student Aid logo